Skip to main content
Hit enter to search or ESC to close
Close Search
ElectriCare Tools
    ElectriCare Tools


    JobEngine Report

    Reporting for JobEngine Projects

    Lead Tech Name(Required)
    MM slash DD slash YYYY
    Customer Name(Required)
    System Type(Required)
    Installation Type(Required)
    Size of MSP, POC breaker size, MSP condition, etc.
    System condition, number of arrays, general mentions, safety issues, racking information, etc. Ensure you take all photos necessary.

    Battery Info

    Batteries installed on the outside generally need to be at least 3 feet away from any door, window or opening leading into a habitable space.
    Fire Sprinklers
    Heat Alarm
    Battery information, concerns, tie-in information, etc.

    General Information

    All safety concerns need to be documented with photos also.
    End goal is a finalized and interconnected system - any information given here might be useful for JobEngine in moving the project forward to the next stage.